Anhui Volkswagen Phase II Project

This project is for the UB workstation at Volkswagen Anhui, covering vehicle model MM1. The required takt time is 60 seconds per vehicle with an automation rate of 90%. The main processes involved include spot welding, stud welding, arc welding and material handling.